Kourosh Mehin/DPI/VICGOV1 
09/02/2007 11:17 AM
To
Mary Jane/DPI/VICGOV1@VICGOV1
cc

bcc

Subject
Fw: Update 7 - CRC-1 Well - Questionnaire on Pre Spud



Hi Mary
Please for your record. Thanks
KM
Regards
 Kourosh Mehin
----------------------------------------------------
Dr Kourosh Mehin
Principal Petroleum Resources Advisor
Tel.:  (61 3) 9658 4416
Fax.: (61 3) 9658 4499
Mobile: 0419 597 010
 
----- Forwarded by Kourosh Mehin/DPI/VICGOV1 on 09/02/2007 11:17 AM -----
terry.greaney@bigpond.com 
08/02/2007 04:23 PM	
To
alam@upstreampetroleum.com.au, andres@iimetro.com.au, 
Andrew.Stobie@Halliburton.com, Bala.Balendran@dpi.vic.gov.au, 
Edward.Bamborough@bakerhughes.com, barry.huffer@halliburton.com, 
BPrain@CenturyDrilling.com.au, bmorrison@melbourne.oilfield.slb.com, 
bassels@airnet.com.au, CMccoole@CenturyDrilling.com.au, 
cchagnon@perth.oilfield.slb.com, cbuskirk@perth.oilfield.slb.com, 
chris.boreham@ga.gov.au, ausdann@yahoo.com, 
christopher.skewes@mitubulars.com.au, DThompson@CenturyDrilling.com.au, 
pyrenees@netcon.net.au, dw@corpro-group.com, david.wong@dpi.vic.gov.au, 
John.Dean@woodgroup.com, dessyprananto@upstreampetroleum.com.au, 
dsvco2crc@upstreampetroleum.com.au, DSVKAROON@UPSTREAMPETROLEUM.COM.AU, 
duncannuttall@upstreampetroleum.com.au, DWAYNE.ROTA@woodside.com.au, 
elenaavrutis@upstreampetroleum.com.au, Errol.Smeaton@Halliburton.com, 
fee@premiumcasing.com.au, transco@a011.aone.net.au, 
greghogan@upstreampetroleum.com.au, iblack@upstreampetroleum.com.au, 
IDunn@CenturyDrilling.com.au, fencon@austarnet.com.au, ian@hofco.com.au, 
Ian.Mitchell@bakerhughes.com, Spikin@bigpond.com, 
Ian.Templeton@chevron.com, irinaheaver@upstreampetroleum.com.au, 
drillbits@ozemail.com.au, johnah-cann@upstreampetroleum.com.au, 
kbruce@premiumcasing.com.au, kerstine@hofco.com.au, 
spud.murph@yahoo.com.au, kourosh.mehin@dpi.vic.gov.au, 
ksitu@centurydrilling.com.au, vlot@perth.oilfield.slb.com, 
lrigg@melbourne.oilfield.slb.com, Lucien.Bianchi@Halliburton.com, 
mascoli@premiumcasing.com.au, mark.dibbens@otsa-oceania.biz, 
MARTIN.RICE@woodside.com.au, michelle.hendricks@dpi.vic.gov.au, 
nsantarelli@imdex.com.au, pkosarek@perth.oilfield.slb.com, 
pauljahn@upstreampetroleum.com.au, Paul.Korona@inteq.com, 
PMacKintosh@CenturyDrilling.com.au, peterjackson@upstreampetroleum.com.au, 
peter.aronetz@delosgaia.nl, philharrick@upstreampetroleum.com.au, 
philippkvashko@upstreampetroleum.com.au, 
rtwigg@melbourne.oilfield.slb.com, sharma2@slb.com, 
simonmewing@upstreampetroleum.com.au, SFord@centurydrilling.com.au, 
terry.mckinley@dpi.vic.gov.au
cc

Subject
Update 7 - CRC-1 Well - Questionnaire on Pre Spud
	

	


We have now been given the go ahead to move to CO2CRC Pilot Project 
Limited’s CRC-1 in the Otway (10 km north west of Peterborough, Victoria). 
The rig is expected to move the first major loads on Saturday February 
10.  Please check with myself before mobilizing equipment & personnel 
however, depending on point of origin, I’d expect most equipment needed 
for the spud of well to be given go ahead to mobilize early next week. 
Other equipment needed later in the well (eg for coring, running 
production casing, etc) wont be mobilized until a little later based on 
when needed (check with me first).
 
I’ll be reviewing with Century the expected spud date and will put out a 
revised services schedule later today or tomorrow. 
Site maps and other information such as freight forwarding address will 
also be recirculated.
 
I’ll also be reviewing with Century and service companies when personnel 
can be onsite to see if it’s feasible to proceed with the pre-spud meeting 
on Tuesday February 13. Please respond as to whether your site personnel 
or a representative could be present in the Otway (near the CRC-1 site) on 
(a) Tuesday Feb 13, (b) Thursday Feb 15, or (c) either date. Please 
respond by e-mail on availability. We expect we’ll finalise date by 
tomorrow. If we can get service company representatives together its 
possible we could have a technical pre-spud meeting even if some of the 
rig crew are still in Gippsland.
 
 
Rig Status: The rig was released from Karoon Gas Pty Ltd’s Megascolides 2 
at 1800 hrs on Saturday February 3 and has since been preparing on the 
basis of a move to the Otway. Trucks are being mobilized for moving on 
Saturday February 10.
 
The e-mail address for wellsite supervisors will be 
dsvco2crc@upstreampetroleum.com.au 
Kevin Murphy can also be contacted on 0407 058 095 or for the present at 
the Gippsland site 03 5626 1010.
 
 
Regards
 
Terry Greaney
Upstream Petroleum – Onshore Drilling Project Leader (CO2CRC Pilot Project 
Ltd)
Mobile: 0416 001237 / Phone: 03-8625 8400 or 8625 8544 (direct)
e-mail: terry.greaney@bigpond.com  (preferred)
 terrygreaney@upstreampetroleum.com.au (alternate)
                 
 
 
 
 
 
 
 
 
 